The Process
The following steps are designed to help a homeowner through the various states involved in either putting in a new suite in an existing house, or keeping an existing suite that has no prior permits or approval.

STEP 1: Apply for a Special Inspection and book an appointment for this inspection. A Special Inspection is a coordinated inspection carried out by the Building, Electrical and Plumbing Inspectors. Its purpose is to determine what upgrading work would be required to legalize a suite.

STEP 2: Review Upgrading Letter. You will receive a letter listing the permits, plans, and upgrading requirements. Please read the letter carefully and prepare any documents that are required to obtain permits (e.g. Plans).

STEP 3: Obtain Permits. Bring the letter to City Hall (453 West 12th Ave, 2nd floor of the East Wing Building) with the necessary plans as indicated on the letter and apply for a Combined Development and Building Permit.

NOTE: A Combined Development and Building Permit can be obtained by the homeowner. However, Electrical, Plumbing and Gas Permits, if required will only be issued to licensed contractors.

STEP 4: Call for Inspections. Progress inspections are required during the course of the upgrading. Several inspections may be required before a job can be finalized. To book a progress inspection or final inspection for a secondary suite, you or your contractor may phone 3-1-1.

STEP 5: Suite Approval. If the work meets al requirements, your suite will be approved. Staff in the Secondary Suite Office will send you a letter confirming this.

STEP 6: Annual Business License. An annual Business License will be required for rental suites. Please see staff in the License Office or phone 3-1-1.

Permits, Plans and Upgrading Requirements:
The information below has been prepared as a guide to homeowners only. The relevant City By-Law and/or Code requirements will take precedence.

Permits:
A Development and Building Permit will be required to carry out upgrading work and to formally change the use of your house from a one-family dwelling to a one-family dwelling with a seconday suite. The homeowner of his/her representatives can apply for this permit.

If the upgrading letter identifies any required trades permits, i.e. Electrical, Plumbing or Gas Permits, these permits can only be obtained by licensed contractors.

Plan Requirements:
Plans are required at the time you apply for a Development and Building Permit. In most cases, two sets of simple floor plans will be acceptable, showing the layout of the floor level where the suite is located

These plans do not need to be prepared by a professional; however, they must be drawn to scale, with location and dimensions of all secondary suite rooms (bedrooms/kitchen/bathroom/living room etc.), stairs, windows and doors clearly labelled. Plans should also include location of electrical outlets and plumbing fixtures.

If on-site parking is required, two sets of site plans will also be required showing the location and dimensions of the on-site parking space. Building a new garage or carport will require further plans and permits.

If additions or alterations are proposed or required in other parts of the building, or if the building is raised or lowered, further plans will be required.

For information regarding the submission of drawings for new construction, please contact the Enquiry Centre at 604-873-7611.

Upgrading Requirements:
The following are general requirements for a secondary suite, identified through a Special Inspection of the building, where Building, Electrical and Plumbing/Gas inspectors attend the property together. The focus of the inspection is the suite area; however, any hazards throughout the building that are identified during the inspection, must be corrected whether or not a suite is retained or installed.

Parking:
• Houses built before April 20, 2004 – one on-site parking space will be accepted.
• Houses built after April 20, 2004 – require two on-site parking spaces (one for the primary dwelling unit and one for the secondary suite).
• A parking space is 8” x 18”. In some cases, a site peculiarity may allow a relaxation
• A durable surface is required for parking spaces.

Fire Separation:
• Existing lath and plaster in good condition, or minimum ½ inch gypsum wallboard is required on walls and/or ceiling between the primary swelling unit and the secondary suite.
• Self-closing devices are required on any interconnection doors between units.

Electrical:
• For sprinklered buildings, interconnected, hard-wired smoke alarms, installed with a permanent connection to an electrical circuit, are required outside every bedroom, and at least one smoke alarm on every storey.
• For unsprinklered suites, in addition to the above, these smoke alarms must be equipped with carbon monoxide detection, battery backup and manual silencing devices which will silence the alarm for a period of 10 minutes, after which the alarm will continue to function
• The proper number of receptacles/ appliance circuits will be required in the suite.
• The main electrical service must be sized to accommodate all electrical loads (e.g. electric dryers will require a minimum 100 amp service).

Plumping and Gas:
• Existing plumping and gas fixtures must be properly installed with approved traps and vents.
• Furnace and hot water tank vents require proper clearance from combustible materials.
• Gas appliances must be installed in an approved manner.

Changes to the Zoning and Development By-law now make it possible to have a secondary suite in most detached single family homes in the City of Vancouver. In addition, building code standards have been relaxed to facilitate the secondary suite process. Example of these changes include:
• “One-Family Dwelling with Secondary Suite” to be permitted in all residential zones, i.e. all zones with an “R” designation; and specific CD-1 zones;
• No more “Phase-out Suite”;
• One on-site parking space will be acceptable for a house with a secondary suite, if the house was built prior to April 20, 2004;
• Partial sprinkler system will no longer be a requirement for existing non-sprinklered houses (certain conditions apply). Instead, interconnected hard-wired smoke alarms equipped with battery backup and manual silencing device are to be installed;
• Ceiling height requirement for a existing house reduced to 6’6” over 80% of the suite area and in all areas of exit from the suite.

One time inspection and permit fees as follows:

Special Inspection - $$155 (plus HST)
Combined Development and Building Permit – from $661
Electrical Permit – from $58
Plumbing Permit – from $145
Gas Permit – from $152

For more information on secondary suites and to book inspections, please phone 3-1-1.

Annual fees as follows:

Annual Business License - $61
*One-time fee for new application - $50

Please contact the License Office at 3-1-1.

Additional Water, Sewer and Recycling Flat Rates (part of your annual property tax). For more information, please contact the Utility Billing Office or phone 3-1-1.

Water - $182
Sewer - $95
Recycling - $24

Note: Rates subject to change without notice.

Guidelines from the City of Vancouver

The data relating to real estate on this website comes in part from the MLS® Reciprocity program of either the Real Estate Board of Greater Vancouver (REBGV), the Fraser Valley Real Estate Board (FVREB) or the Chilliwack and District Real Estate Board (CADREB). Real estate listings held by participating real estate firms are marked with the MLS® logo and detailed information about the listing includes the name of the listing agent. This representation is based in whole or part on data generated by either the REBGV, the FVREB or the CADREB which assumes no responsibility for its accuracy. The materials contained on this page may not be reproduced without the express written consent of either the REBGV, the FVREB or the CADREB.